top of page

1-3/4” Total Equipment and Service unit with 80K Total injector head

1-3/4” Total Equipment and Service unit with 80K Total injector head
1/1
1-3/4” Total Equipment and Service unit with 80K Total injector head - 20,500'
-
Double Pumper – Triplex 1330 HHP Total Equipment Pump
-
Nitrogen pump – 180K Total Equipment
-
Combo Pump – 600 HHP fluid with 180K nitrogen
– Total Equipment -
50 Ton Crane
-
4-1/16” 15K BOP’s (TOT), flowcross, and dual packoff
COILED TUBING
• (3) 2-3/8” Coiled Tubing Units –
23,500'
• (1) 2” Coiled Tubing Unit – 23,000'
• (1) 1-3/4” Coiled Tubing Unit -
20,500'
• (1) 1-1/4” Coiled Tubing Units -
20,500'
• (1) 1-1/4” Coiled Tubing Units - 21,750'
• (1) 1-1/4” Bodyload Coiled
Tubing Unit - 15,500'
bottom of page