top of page

1-3/4” Total Equipment and Service unit with 80K Total injector head - 20,500'

  • Double Pumper – Triplex 1330 HHP Total Equipment Pump

  • Nitrogen pump – 180K Total Equipment

  • Combo Pump – 600 HHP fluid with 180K nitrogen
    – Total Equipment

  • 50 Ton Crane

  • 4-1/16” 15K BOP’s (TOT), flowcross, and dual packoff

bottom of page